Finally, construction for the long awaited Arjona and Monteith replacements has begun. While the erection of the classroom-only building next to the Student Union has been steadily progressing, the second building has just started last week. Located between the Babbidge Library and the Hawley Armory (at the location of the “old Co-op”), it will have four floors. The first, pictured on the right (click for a larger view), will have classrooms, along with part of the second floor. Economics will share space with Linguistics on the third floor. It is scheduled to be ready for the Fall 2012 term.
Update: More about this on the UConn Today blog.